Difference between revisions of "BLTWG Meeting 07/23/2018"

From GlueXWiki
Jump to: navigation, search
(Created page with "=== Organization === * Time: 11:30 EDT * JLab meeting room: A110 * Connecting: detailed instructions are here ** H.323 ip address: 199....")
 
 
(3 intermediate revisions by 2 users not shown)
Line 7: Line 7:
 
** phone: 408-740-7256 or 888-240-2560
 
** phone: 408-740-7256 or 888-240-2560
 
* Conference id: 536076821a
 
* Conference id: 536076821a
* Present: <!--Richard J., Alexandre D., Elton S., Tim W., Alex B., Justin S., Dan S., and Curtis M.-->
+
* Present: Richard J., Ben W., Tim W., Alex O., Sasha S., Elton S., Justin S., Peter P., Eugene C., and Curtis M.
  
 
=== Agenda ===
 
=== Agenda ===
Line 17: Line 17:
 
#*** CB spectrum and polarization studies - ''Glasgow''  
 
#*** CB spectrum and polarization studies - ''Glasgow''  
 
#* Update on TPOL polarization results - ''Sebastian''
 
#* Update on TPOL polarization results - ''Sebastian''
 +
#** [https://halldweb.jlab.org/wiki/images/7/73/TPOLUpdate.pdf TPOL update]
 
#** systematics studies with 750um converter data
 
#** systematics studies with 750um converter data
 
#* Update on hadronic asymmetries - ''Justin'', ''Alexander''
 
#* Update on hadronic asymmetries - ''Justin'', ''Alexander''

Latest revision as of 11:40, 23 July 2018

Organization

  • Time: 11:30 EDT
  • JLab meeting room: A110
  • Connecting: detailed instructions are here
  • Conference id: 536076821a
  • Present: Richard J., Ben W., Tim W., Alex O., Sasha S., Elton S., Justin S., Peter P., Eugene C., and Curtis M.

Agenda

  1. Announcements
  2. Beam monitoring issues
    • Photon beam simulations
    • Update on TPOL polarization results - Sebastian
      • TPOL update
      • systematics studies with 750um converter data
    • Update on hadronic asymmetries - Justin, Alexander
    • TPOL fADC algorithm studies - Sebastian
  3. Reconfiguration of the tagger for CPP - Richard
  4. Upcoming activities
    • removal/remounting of 5 virgin 50um diamonds
    • CLS measurements August 9-11 (machine down, run postponed)
    • progress with TAGM fiber upgrade
  5. Any other business