Difference between revisions of "BLTWG Meeting 07/27/2009"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
Line 2: Line 2:
 
* Place: EVO and ESNET (with telephone bridge)
 
* Place: EVO and ESNET (with telephone bridge)
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:  
+
* Present: Tim, Ashot, Pawel, Eugene, Sasha, Victor, Dmitri, Sasha, Igor,  Richard, Franz, Dan.
  
  

Latest revision as of 11:16, 27 July 2009

  • Time: 11:00 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present: Tim, Ashot, Pawel, Eugene, Sasha, Victor, Dmitri, Sasha, Igor, Richard, Franz, Dan.


Agenda

  1. Simulations update + cave backgrounds - Sasha
  2. Draft report from the Tagger Magnet Review - Tim
  3. Work status reports - everyone
  4. Report on meeting with BNL diamond group - Richard
  5. Beamline work needed for Lehmann Review - Eugene
  6. Work plan in response to magnet review - discussion

Notes