Difference between revisions of "BLTWG Meeting 08/20/2012"
From GlueXWiki
(Created page with "* Time: 11:30 EST * Place: ESNET and EVO (with telephone bridge id 570 7748) * Connecting: instructions are here * Present: ---- ===Agen...") |
(→Agenda) |
||
Line 9: | Line 9: | ||
#* possible loan of DAq system with FADC to UConn (in transit) | #* possible loan of DAq system with FADC to UConn (in transit) | ||
#* two 50 micron SIPM's from Jlab (received) | #* two 50 micron SIPM's from Jlab (received) | ||
+ | # Report from Sascha regarding activities at Jlab -- ''see below'' | ||
+ | |||
+ | === Notes === | ||
+ | Hello Richard, | ||
+ | |||
+ | I will not be able to attend our next beamline meeting. | ||
+ | I am on vacations in Moscow now. | ||
+ | |||
+ | Here is a short update: | ||
+ | |||
+ | - I've sent an SOW draft to Franz and Dan about a week ago. | ||
+ | Almost all other docs for the contract are in place. | ||
+ | |||
+ | - I am preparing a collaboration MOU with ASU now. The draft | ||
+ | is almost ready | ||
+ | |||
+ | - Ivan from MEPhI is back to JLab. We are trying to finalize | ||
+ | the technical layout of the PS. I will order scint. tiles | ||
+ | and WLS fibers shortly. | ||
+ | |||
+ | - Hamamatsu said that they would be able to send a first article | ||
+ | of SiPMs (~200 pcs) to us in the beginning of November. |
Revision as of 11:33, 20 August 2012
- Time: 11:30 EST
- Place: ESNET and EVO (with telephone bridge id 570 7748)
- Connecting: instructions are here
- Present:
Agenda
- Announcements
- Update on microscope construction -- Richard
- possible loan of DAq system with FADC to UConn (in transit)
- two 50 micron SIPM's from Jlab (received)
- Report from Sascha regarding activities at Jlab -- see below
Notes
Hello Richard,
I will not be able to attend our next beamline meeting. I am on vacations in Moscow now.
Here is a short update:
- I've sent an SOW draft to Franz and Dan about a week ago.
Almost all other docs for the contract are in place.
- I am preparing a collaboration MOU with ASU now. The draft
is almost ready
- Ivan from MEPhI is back to JLab. We are trying to finalize
the technical layout of the PS. I will order scint. tiles and WLS fibers shortly.
- Hamamatsu said that they would be able to send a first article
of SiPMs (~200 pcs) to us in the beginning of November.