Difference between revisions of "BLTWG Meeting 08/20/2012"

From GlueXWiki
Jump to: navigation, search
(Notes)
(Agenda)
Line 6: Line 6:
 
===Agenda===
 
===Agenda===
 
# Announcements
 
# Announcements
 +
# Report from CUA -- ''Franz''
 
# Update on microscope construction -- ''Richard''
 
# Update on microscope construction -- ''Richard''
 
#* possible loan of DAq system with FADC to UConn (in transit)
 
#* possible loan of DAq system with FADC to UConn (in transit)

Revision as of 11:34, 20 August 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 570 7748)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Report from CUA -- Franz
  3. Update on microscope construction -- Richard
    • possible loan of DAq system with FADC to UConn (in transit)
    • two 50 micron SIPM's from Jlab (received)
  4. Report from Sascha regarding activities at Jlab -- see below

Notes

Hello Richard,

I will not be able to attend our next beamline meeting. I am on vacations in Moscow now.

Here is a short update:

  • I've sent an SOW draft to Franz and Dan about a week ago. Almost all other docs for the contract are in place.
  • I am preparing a collaboration MOU with ASU now. The draft is almost ready
  • Ivan from MEPhI is back to JLab. We are trying to finalize the technical layout of the PS. I will order scint. tiles and WLS fibers shortly.
  • Hamamatsu said that they would be able to send a first article of SiPMs (~200 pcs) to us in the beginning of November.