Difference between revisions of "BLTWG Meeting 09/15/2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 13: Line 13:
 
# [[GlueX-Collaboration-Oct-2014|Collaboration Meeting]]
 
# [[GlueX-Collaboration-Oct-2014|Collaboration Meeting]]
 
# Accelerator-Hall D Interface Control Document, [http://zeus.phys.uconn.edu/~jonesrt/outbox/ICD_Accelerator-HallD_draft14.pdf draft 14] - ''Elton S.''
 
# Accelerator-Hall D Interface Control Document, [http://zeus.phys.uconn.edu/~jonesrt/outbox/ICD_Accelerator-HallD_draft14.pdf draft 14] - ''Elton S.''
# Photon beam commissioning plan review - ''Alexandre D.''
+
# Photon beam commissioning plan review - ''Richard J.''
 
# [[Beam Simulations|Tagger hall simulations]] - ''Richard J.''
 
# [[Beam Simulations|Tagger hall simulations]] - ''Richard J.''
 
# Decision: tagger hall configuration during initial beam tune - ''discussion''
 
# Decision: tagger hall configuration during initial beam tune - ''discussion''

Revision as of 10:58, 15 September 2014

Organization

  • Time: 11:30 EST, pre-meeting at 11:00 EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821
  • Present:

Agenda

  1. Announcements
  2. Collaboration Meeting
  3. Accelerator-Hall D Interface Control Document, draft 14 - Elton S.
  4. Photon beam commissioning plan review - Richard J.
  5. Tagger hall simulations - Richard J.
  6. Decision: tagger hall configuration during initial beam tune - discussion
  7. Report on tagger hodoscope tests - Franz K.
  8. Report on tagger microscope setup and tests in ESB - James M, Alex B.
    • Finished tagger microscope construction report
  9. Report on active collimator setup and tests - Alex B.
  10. Report on pair spectrometer setup and tests - Alex S.
  11. Report on diamond milling and mount construction - Brendan P
  12. Report on polarimeter construction - Michael D