Difference between revisions of "BLTWG Meeting 09/15/2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 15: Line 15:
 
# [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Photon beam commissioning plan review] - ''Richard J.''
 
# [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Photon beam commissioning plan review] - ''Richard J.''
 
# [[Beam Simulations|Tagger hall simulations]] - ''Richard J.''
 
# [[Beam Simulations|Tagger hall simulations]] - ''Richard J.''
# Decision: tagger hall configuration during initial beam tune - ''discussion''
+
# Tagger hall configuration during initial beam tune - ''discussion''
# Report on tagger hodoscope tests - ''Franz K.''
+
# Report on tagger hodoscope setup and tests in Tagger Hall - ''Franz K.''
 
# Report on tagger microscope setup and tests in ESB - ''James M, Alex B.''
 
# Report on tagger microscope setup and tests in ESB - ''James M, Alex B.''
 
#* Finished tagger microscope construction report
 
#* Finished tagger microscope construction report

Revision as of 11:05, 15 September 2014

Organization

  • Time: 11:30 EST, pre-meeting at 11:00 EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821
  • Present:

Agenda

  1. Announcements
  2. Collaboration Meeting
  3. Accelerator-Hall D Interface Control Document, draft 14 - Elton S.
  4. Photon beam commissioning plan review - Richard J.
  5. Tagger hall simulations - Richard J.
  6. Tagger hall configuration during initial beam tune - discussion
  7. Report on tagger hodoscope setup and tests in Tagger Hall - Franz K.
  8. Report on tagger microscope setup and tests in ESB - James M, Alex B.
    • Finished tagger microscope construction report
  9. Report on active collimator setup and tests - Alex B.
  10. Report on pair spectrometer setup and tests - Alex S.
  11. Report on diamond milling and mount construction - Brendan P
  12. Report on polarimeter construction - Michael D