Difference between revisions of "BLTWG Meeting 09/15/2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 13: Line 13:
 
# Accelerator-Hall D Interface Control Document, [http://zeus.phys.uconn.edu/~jonesrt/outbox/ICD_Accelerator-HallD_draft14.pdf draft 14] - ''Elton S.''
 
# Accelerator-Hall D Interface Control Document, [http://zeus.phys.uconn.edu/~jonesrt/outbox/ICD_Accelerator-HallD_draft14.pdf draft 14] - ''Elton S.''
 
# [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Photon beam commissioning plan overview] - ''Richard J.''
 
# [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Photon beam commissioning plan overview] - ''Richard J.''
# [http://www.jlab.org/Hall-D/shifts/ Shift schedule review]
+
# [http://www.jlab.org/Hall-D/shifts/index.php?start_day=15&start_month=9&start_year=2014&end_day=31&end_month=12&end_year=2014&display=schedule&clasuser=&clasinstitute=&experiment=&stype=schedule Shift schedule review]
 
# [[Beam Simulations|Tagger hall simulations]] - ''Richard J.''
 
# [[Beam Simulations|Tagger hall simulations]] - ''Richard J.''
 
# Tagger hall configuration during initial beam tune - ''discussion''
 
# Tagger hall configuration during initial beam tune - ''discussion''

Revision as of 11:35, 15 September 2014

Organization

  • Time: 11:30 EST, pre-meeting at 11:00 EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821
  • Present: Richard J., Alex B., Brendan P., James M., Natalie W., Franz K., Nathan S., and Todd S.

Agenda

  1. Announcements
  2. Collaboration Meeting
  3. Accelerator-Hall D Interface Control Document, draft 14 - Elton S.
  4. Photon beam commissioning plan overview - Richard J.
  5. Shift schedule review
  6. Tagger hall simulations - Richard J.
  7. Tagger hall configuration during initial beam tune - discussion
  8. Report on tagger hodoscope setup and tests in Tagger Hall - Franz K.
  9. Report on tagger microscope setup and tests in ESB - James M, Alex B.
  10. Report on active collimator setup and tests - Alex B.
  11. Report on pair spectrometer setup and tests - Alex S.
  12. Report on diamond milling and mount construction - Brendan P
  13. Report on polarimeter construction - Michael D