Difference between revisions of "BLTWG Meeting 09/15/2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")
 
(13 intermediate revisions by 3 users not shown)
Line 6: Line 6:
 
** phone: 408-740-7256 or 888-240-2560
 
** phone: 408-740-7256 or 888-240-2560
 
* Conference id: 536076821
 
* Conference id: 536076821
* Present:  
+
* Present: Richard J., Alex B., Brendan P., James M., Natalie W., Franz K., Nathan S., Barry R., Eugene C., Alex S., and Todd S.
<!--Richard J., Alex B., Franz K., Nathan S., Curtis M., Hovanes E., Tim W., Eugene C., Natalie W., Alex D., and Michael D.-->
+
  
 
=== Agenda ===
 
=== Agenda ===
 
# Announcements
 
# Announcements
 
# [[GlueX-Collaboration-Oct-2014|Collaboration Meeting]]
 
# [[GlueX-Collaboration-Oct-2014|Collaboration Meeting]]
# Accelerator-Hall D Interface Control Document, draft 14 - ''Elton S.''
+
# Accelerator-Hall D Interface Control Document, [http://zeus.phys.uconn.edu/~jonesrt/outbox/ICD_Accelerator-HallD_draft14.pdf draft 14] - ''Elton S.''
# Photon beam commissioning plan review - ''Alexandre D.''
+
# [https://halldweb.jlab.org/hdops/wiki/index.php/Fall_2014_Commissioning_Plan Photon beam commissioning plan overview] - ''Richard J.''
 +
# [http://www.jlab.org/Hall-D/shifts/index.php?start_day=15&start_month=9&start_year=2014&end_day=31&end_month=12&end_year=2014&display=schedule&clasuser=&clasinstitute=&experiment=&stype=schedule Shift schedule review]
 
# [[Beam Simulations|Tagger hall simulations]] - ''Richard J.''
 
# [[Beam Simulations|Tagger hall simulations]] - ''Richard J.''
# Decision: tagger hall configuration during initial beam tune - ''discussion''
+
# Tagger hall configuration during initial beam tune - ''discussion''
# Report on tagger hodoscope tests - ''Franz K.''
+
# Report on tagger hodoscope setup and tests in Tagger Hall - ''Franz K.''
 
# Report on tagger microscope setup and tests in ESB - ''James M, Alex B.''
 
# Report on tagger microscope setup and tests in ESB - ''James M, Alex B.''
#* Finished tagger microscope construction report
+
#* [http://zeus.phys.uconn.edu/halld/tagger/fp-microscope/fiberQA-2-2014/Travelers.pdf Tagger microscope construction summary document]
 
# Report on active collimator setup and tests - ''Alex B.''
 
# Report on active collimator setup and tests - ''Alex B.''
 
# Report on pair spectrometer setup and tests - ''Alex S.''
 
# Report on pair spectrometer setup and tests - ''Alex S.''
#* [https://halldweb1.jlab.org/wiki/index.php/Field_stability_study Pair spectrometer field stability study] - ''Alexandre D.''
+
#* [https://halldweb.jlab.org/wiki/index.php/Field_stability_study Pair spectrometer field stability study] - ''Alexandre D.''
 
# Report on diamond milling and mount construction - ''Brendan P''
 
# Report on diamond milling and mount construction - ''Brendan P''
 
# Report on polarimeter construction - ''Michael D''
 
# Report on polarimeter construction - ''Michael D''

Latest revision as of 04:15, 1 April 2015

Organization

  • Time: 11:30 EST, pre-meeting at 11:00 EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821
  • Present: Richard J., Alex B., Brendan P., James M., Natalie W., Franz K., Nathan S., Barry R., Eugene C., Alex S., and Todd S.

Agenda

  1. Announcements
  2. Collaboration Meeting
  3. Accelerator-Hall D Interface Control Document, draft 14 - Elton S.
  4. Photon beam commissioning plan overview - Richard J.
  5. Shift schedule review
  6. Tagger hall simulations - Richard J.
  7. Tagger hall configuration during initial beam tune - discussion
  8. Report on tagger hodoscope setup and tests in Tagger Hall - Franz K.
  9. Report on tagger microscope setup and tests in ESB - James M, Alex B.
  10. Report on active collimator setup and tests - Alex B.
  11. Report on pair spectrometer setup and tests - Alex S.
  12. Report on diamond milling and mount construction - Brendan P
  13. Report on polarimeter construction - Michael D