Difference between revisions of "BLTWG Meeting 09/15/2014"

From GlueXWiki
Jump to: navigation, search
m (Text replacement - "hdops.jlab.org/wiki" to "halldweb.jlab.org/hdops/wiki")
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")
 
Line 21: Line 21:
 
# Report on active collimator setup and tests - ''Alex B.''
 
# Report on active collimator setup and tests - ''Alex B.''
 
# Report on pair spectrometer setup and tests - ''Alex S.''
 
# Report on pair spectrometer setup and tests - ''Alex S.''
#* [https://halldweb1.jlab.org/wiki/index.php/Field_stability_study Pair spectrometer field stability study] - ''Alexandre D.''
+
#* [https://halldweb.jlab.org/wiki/index.php/Field_stability_study Pair spectrometer field stability study] - ''Alexandre D.''
 
# Report on diamond milling and mount construction - ''Brendan P''
 
# Report on diamond milling and mount construction - ''Brendan P''
 
# Report on polarimeter construction - ''Michael D''
 
# Report on polarimeter construction - ''Michael D''

Latest revision as of 04:15, 1 April 2015

Organization

  • Time: 11:30 EST, pre-meeting at 11:00 EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821
  • Present: Richard J., Alex B., Brendan P., James M., Natalie W., Franz K., Nathan S., Barry R., Eugene C., Alex S., and Todd S.

Agenda

  1. Announcements
  2. Collaboration Meeting
  3. Accelerator-Hall D Interface Control Document, draft 14 - Elton S.
  4. Photon beam commissioning plan overview - Richard J.
  5. Shift schedule review
  6. Tagger hall simulations - Richard J.
  7. Tagger hall configuration during initial beam tune - discussion
  8. Report on tagger hodoscope setup and tests in Tagger Hall - Franz K.
  9. Report on tagger microscope setup and tests in ESB - James M, Alex B.
  10. Report on active collimator setup and tests - Alex B.
  11. Report on pair spectrometer setup and tests - Alex S.
  12. Report on diamond milling and mount construction - Brendan P
  13. Report on polarimeter construction - Michael D