Difference between revisions of "BLTWG Meeting 1/31/2008"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 5: Line 5:
 
===Agenda===
 
===Agenda===
 
# Review of progress on [[Photon Beam Design Requirements|subsystem specifications]]
 
# Review of progress on [[Photon Beam Design Requirements|subsystem specifications]]
 +
# Answers to latest questions from engineering design firms
 
# Results from analysis of CHESS 2007 run data [http://nuclear.gla.ac.uk/~yang/diamond/2007%20diamond%20test%20results.ppt]
 
# Results from analysis of CHESS 2007 run data [http://nuclear.gla.ac.uk/~yang/diamond/2007%20diamond%20test%20results.ppt]
 
# Use of [[Standard Beamline Quadrupole Specification|standard beamline quads]] for the tagger quad
 
# Use of [[Standard Beamline Quadrupole Specification|standard beamline quads]] for the tagger quad

Revision as of 18:11, 31 January 2008

  • Time: 10:00 EST
  • Place: EVO and ESNET
  • Present: GlueX tagged beam group members

Agenda

  1. Review of progress on subsystem specifications
  2. Answers to latest questions from engineering design firms
  3. Results from analysis of CHESS 2007 run data [1]
  4. Use of standard beamline quads for the tagger quad
  5. Progress on the electron beam requirements document
  6. Date for meeting with machine experts
  7. Update on communications with YERPHI colleagues