Difference between revisions of "BLTWG Meeting 10/04/2010"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 7: Line 7:
  
 
# Report from the Lehmann Review -- ''discussion''
 
# Report from the Lehmann Review -- ''discussion''
 +
# Status of the tagger build-to-drawings package -- ''Tim''
 
# Simulation of background radiation in the tagger hall -- ''Sascha''  
 
# Simulation of background radiation in the tagger hall -- ''Sascha''  
 
# Measurements of Photonique SiPM radiation damage with a source -- ''Yi''
 
# Measurements of Photonique SiPM radiation damage with a source -- ''Yi''

Revision as of 11:17, 4 October 2010

  • Time: 11:00 EST
  • Place: ESNET and EVO (with telephone bridge id 2384128)
  • Connecting: instructions are here
  • Present: Tim W., Dan S., Yi X., Hovannes A., Alex S., Igor S., Brendan P, and Richard J.

Agenda

  1. Report from the Lehmann Review -- discussion
  2. Status of the tagger build-to-drawings package -- Tim
  3. Simulation of background radiation in the tagger hall -- Sascha
  4. Measurements of Photonique SiPM radiation damage with a source -- Yi
  5. Test run plans -- discussion

Notes