Difference between revisions of "BLTWG Meeting 10/04/2010"

From GlueXWiki
Jump to: navigation, search
m
Line 2: Line 2:
 
* Place: ESNET and EVO (with telephone bridge id 2384128)  
 
* Place: ESNET and EVO (with telephone bridge id 2384128)  
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present: Tim W., Dan S., Yi X., Hovannes A., Alex S., Igor S., Brendan P, and Richard J.
+
* Present: Tim W., Dan S., Yi Q., Hovannes A., Alex S., Igor S., Brendan P, and Richard J.
  
 
===Agenda===
 
===Agenda===

Revision as of 11:24, 4 October 2010

  • Time: 11:00 EST
  • Place: ESNET and EVO (with telephone bridge id 2384128)
  • Connecting: instructions are here
  • Present: Tim W., Dan S., Yi Q., Hovannes A., Alex S., Igor S., Brendan P, and Richard J.

Agenda

  1. Report from the Lehmann Review -- discussion
  2. Status of the tagger build-to-drawings package -- Tim
  3. Simulation of background radiation in the tagger hall -- Sascha
    1. [1]
  4. Measurements of Photonique SiPM radiation damage with a source -- Yi
  5. Test run plans -- discussion

Notes