Difference between revisions of "BLTWG Meeting 10/13/2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 20: Line 20:
 
# Report on active collimator setup and tests - ''Alex B.''
 
# Report on active collimator setup and tests - ''Alex B.''
 
# Report on pair spectrometer setup and tests - ''Alex S.''
 
# Report on pair spectrometer setup and tests - ''Alex S.''
#* [https://halldweb1.jlab.org/wiki/index.php/Field_stability_study Pair spectrometer field stability study] - ''Alexandre D.''
 
 
# Report on diamond milling and mount construction - ''Brendan P''
 
# Report on diamond milling and mount construction - ''Brendan P''
 
# Report on polarimeter construction - ''Michael D''
 
# Report on polarimeter construction - ''Michael D''

Revision as of 11:26, 13 October 2014

Organization

  • Time: 11:30 EDT
  • Place: For those at JLab the meeting will be held in F326.
  • Connecting: detailed instructions are here
  • Conference id: 536076821
  • Present:

Agenda

  1. Announcements
  2. Accelerator-Hall D Interface Control Document, draft 14 - Elton S.
  3. Photon beam commissioning plan overview - Alexandre D.
  4. Shift schedule review
  5. Tagger hall simulations - Richard J.
  6. Tagger hall configuration during initial beam tune - discussion
  7. Report on tagger hodoscope setup and tests in Tagger Hall - Franz K.
  8. Report on tagger microscope setup and tests - Alex B.
  9. Report on active collimator setup and tests - Alex B.
  10. Report on pair spectrometer setup and tests - Alex S.
  11. Report on diamond milling and mount construction - Brendan P
  12. Report on polarimeter construction - Michael D