Difference between revisions of "BLTWG Meeting 10/13/2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 11: Line 11:
 
=== Agenda ===
 
=== Agenda ===
 
# Announcements
 
# Announcements
 +
# Accelerator schedule update - ''Alexandre D.''
 
# Accelerator-Hall D Interface Control Document, [http://zeus.phys.uconn.edu/~jonesrt/outbox/ICD_Accelerator-HallD_draft14.pdf draft 14] - ''Elton S.''
 
# Accelerator-Hall D Interface Control Document, [http://zeus.phys.uconn.edu/~jonesrt/outbox/ICD_Accelerator-HallD_draft14.pdf draft 14] - ''Elton S.''
 
# [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Photon beam commissioning plan overview] - ''Alexandre D.''
 
# [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Photon beam commissioning plan overview] - ''Alexandre D.''

Revision as of 11:27, 13 October 2014

Organization

  • Time: 11:30 EDT
  • Place: For those at JLab the meeting will be held in F326.
  • Connecting: detailed instructions are here
  • Conference id: 536076821
  • Present:

Agenda

  1. Announcements
  2. Accelerator schedule update - Alexandre D.
  3. Accelerator-Hall D Interface Control Document, draft 14 - Elton S.
  4. Photon beam commissioning plan overview - Alexandre D.
  5. Shift schedule review
  6. Tagger hall simulations - Richard J.
  7. Tagger hall configuration during initial beam tune - discussion
  8. Report on tagger hodoscope setup and tests in Tagger Hall - Franz K.
  9. Report on tagger microscope setup and tests - Alex B.
  10. Report on active collimator setup and tests - Alex B.
  11. Report on pair spectrometer setup and tests - Alex S.
  12. Report on diamond milling and mount construction - Brendan P
  13. Report on polarimeter construction - Michael D