Difference between revisions of "BLTWG Meeting 10/13/2014"
From GlueXWiki
(→Organization) |
|||
Line 7: | Line 7: | ||
** phone: 408-740-7256 or 888-240-2560 | ** phone: 408-740-7256 or 888-240-2560 | ||
* Conference id: 536076821 | * Conference id: 536076821 | ||
− | * Present: Mike D., Natalie W., Alex B., Alex D., Nathan S., Eugene C., Kei M., Sascha S., Tim W., James M., and Brendan P. | + | * Present: Mike D., Natalie W., Alex B., Alex D., Nathan S., Eugene C., Kei M., Sascha S., Tim W., Elton S., Richard J., James M., and Brendan P. |
=== Agenda === | === Agenda === |
Revision as of 11:45, 13 October 2014
Organization
- Time: 11:30 EDT
- Place: For those at JLab the meeting will be held in F326.
- Connecting: detailed instructions are here
- H.323 ip address: 199.48.152.152
- web browser: https://bluejeans.com/536076821
- phone: 408-740-7256 or 888-240-2560
- Conference id: 536076821
- Present: Mike D., Natalie W., Alex B., Alex D., Nathan S., Eugene C., Kei M., Sascha S., Tim W., Elton S., Richard J., James M., and Brendan P.
Agenda
- Announcements
- Accelerator schedule update - Alexandre D.
- Accelerator-Hall D Interface Control Document, draft 14 - Elton S.
- Photon beam commissioning plan overview - Alexandre D.
- Shift schedule review
- Tagger hall simulations - Richard J.
- Tagger hall configuration during initial beam tune - discussion
- Report on tagger hodoscope setup and tests in Tagger Hall - Franz K.
- Report on tagger microscope setup and tests - Alex B.
- Report on active collimator setup and tests - Alex B.
- Report on pair spectrometer setup and tests - Alex S.
- Report on diamond milling and mount construction - Brendan P
- Report on polarimeter construction - Michael D