Difference between revisions of "BLTWG Meeting 10/13/2014"

From GlueXWiki
Jump to: navigation, search
(Agenda)
m (Text replacement - "hdops.jlab.org/wiki" to "halldweb.jlab.org/hdops/wiki")
 
(12 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 
=== Organization ===
 
=== Organization ===
* Time: 11:30 EST, pre-meeting at 11:00 EST
+
* Time: 11:30 EDT
 +
* Place: For those at JLab the meeting will be held in F326.
 
* Connecting: detailed instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: detailed instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
** H.323 ip address: 199.48.152.152
 
** H.323 ip address: 199.48.152.152
Line 6: Line 7:
 
** phone: 408-740-7256 or 888-240-2560
 
** phone: 408-740-7256 or 888-240-2560
 
* Conference id: 536076821
 
* Conference id: 536076821
* Present:  
+
* Present: Mike D., Natalie W., Alex B., Alex D., Nathan S., Eugene C., Kei M., Sascha S., Tim W., Elton S., Richard J., James M., Franz K., and Brendan P.
  
 
=== Agenda ===
 
=== Agenda ===
 
# Announcements
 
# Announcements
 +
# Accelerator schedule update - ''Alexandre D.''
 
# Accelerator-Hall D Interface Control Document, [http://zeus.phys.uconn.edu/~jonesrt/outbox/ICD_Accelerator-HallD_draft14.pdf draft 14] - ''Elton S.''
 
# Accelerator-Hall D Interface Control Document, [http://zeus.phys.uconn.edu/~jonesrt/outbox/ICD_Accelerator-HallD_draft14.pdf draft 14] - ''Elton S.''
# [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Photon beam commissioning plan overview] - ''Richard J.''
+
# [https://halldweb.jlab.org/hdops/wiki/index.php/Fall_2014_Commissioning_Plan Photon beam commissioning plan overview] - ''Alexandre D.''
 
# [http://www.jlab.org/Hall-D/shifts/index.php?start_day=15&start_month=9&start_year=2014&end_day=31&end_month=12&end_year=2014&display=schedule&clasuser=&clasinstitute=&experiment=&stype=schedule Shift schedule review]
 
# [http://www.jlab.org/Hall-D/shifts/index.php?start_day=15&start_month=9&start_year=2014&end_day=31&end_month=12&end_year=2014&display=schedule&clasuser=&clasinstitute=&experiment=&stype=schedule Shift schedule review]
 
# [[Beam Simulations|Tagger hall simulations]] - ''Richard J.''
 
# [[Beam Simulations|Tagger hall simulations]] - ''Richard J.''
Line 19: Line 21:
 
# Report on active collimator setup and tests - ''Alex B.''
 
# Report on active collimator setup and tests - ''Alex B.''
 
# Report on pair spectrometer setup and tests - ''Alex S.''
 
# Report on pair spectrometer setup and tests - ''Alex S.''
#* [https://halldweb1.jlab.org/wiki/index.php/Field_stability_study Pair spectrometer field stability study] - ''Alexandre D.''
 
 
# Report on diamond milling and mount construction - ''Brendan P''
 
# Report on diamond milling and mount construction - ''Brendan P''
# Report on polarimeter construction - ''Michael D''
+
# [http://www.public.asu.edu/~dugger/10-13-2014.pdf Report on polarimeter construction] - ''Michael D''

Latest revision as of 03:04, 1 April 2015

Organization

  • Time: 11:30 EDT
  • Place: For those at JLab the meeting will be held in F326.
  • Connecting: detailed instructions are here
  • Conference id: 536076821
  • Present: Mike D., Natalie W., Alex B., Alex D., Nathan S., Eugene C., Kei M., Sascha S., Tim W., Elton S., Richard J., James M., Franz K., and Brendan P.

Agenda

  1. Announcements
  2. Accelerator schedule update - Alexandre D.
  3. Accelerator-Hall D Interface Control Document, draft 14 - Elton S.
  4. Photon beam commissioning plan overview - Alexandre D.
  5. Shift schedule review
  6. Tagger hall simulations - Richard J.
  7. Tagger hall configuration during initial beam tune - discussion
  8. Report on tagger hodoscope setup and tests in Tagger Hall - Franz K.
  9. Report on tagger microscope setup and tests - Alex B.
  10. Report on active collimator setup and tests - Alex B.
  11. Report on pair spectrometer setup and tests - Alex S.
  12. Report on diamond milling and mount construction - Brendan P
  13. Report on polarimeter construction - Michael D