# Announcements
 
# Announcements
 
# Accelerator-Hall D Interface Control Document, [http://zeus.phys.uconn.edu/~jonesrt/outbox/ICD_Accelerator-HallD_draft14.pdf draft 14] - ''Elton S.''
 
# Accelerator-Hall D Interface Control Document, [http://zeus.phys.uconn.edu/~jonesrt/outbox/ICD_Accelerator-HallD_draft14.pdf draft 14] - ''Elton S.''
# [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Photon beam commissioning plan overview] - ''Richard J.''
+
# [https://hdops.jlab.org/wiki/index.php/Fall_2014_Commissioning_Plan Photon beam commissioning plan overview] - ''Alexandre D.''
 
# [http://www.jlab.org/Hall-D/shifts/index.php?start_day=15&start_month=9&start_year=2014&end_day=31&end_month=12&end_year=2014&display=schedule&clasuser=&clasinstitute=&experiment=&stype=schedule Shift schedule review]
 
# [http://www.jlab.org/Hall-D/shifts/index.php?start_day=15&start_month=9&start_year=2014&end_day=31&end_month=12&end_year=2014&display=schedule&clasuser=&clasinstitute=&experiment=&stype=schedule Shift schedule review]
 
# [[Beam Simulations|Tagger hall simulations]] - ''Richard J.''
 
# [[Beam Simulations|Tagger hall simulations]] - ''Richard J.''

Revision as of 11:25, 13 October 2014

Organization

  • Time: 11:30 EDT
  • Place: For those at JLab the meeting will be held in F326.
  • Connecting: detailed instructions are here
  • Conference id: 536076821
  • Present:

Agenda

  1. Announcements
  2. Accelerator-Hall D Interface Control Document, draft 14 - Elton S.
  3. Photon beam commissioning plan overview - Alexandre D.
  4. Shift schedule review
  5. Tagger hall simulations - Richard J.
  6. Tagger hall configuration during initial beam tune - discussion
  7. Report on tagger hodoscope setup and tests in Tagger Hall - Franz K.
  8. Report on tagger microscope setup and tests - Alex B.
  9. Report on active collimator setup and tests - Alex B.
  10. Report on pair spectrometer setup and tests - Alex S.
  11. Report on diamond milling and mount construction - Brendan P
  12. Report on polarimeter construction - Michael D