Difference between revisions of "BLTWG Meeting 10/13/2014"

From GlueXWiki
Jump to: navigation, search
(Organization)
(Organization)
Line 1: Line 1:
 
=== Organization ===
 
=== Organization ===
* Time: 11:30 EST
+
* Time: 11:30 EDT
 
* Connecting: detailed instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: detailed instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
** H.323 ip address: 199.48.152.152
 
** H.323 ip address: 199.48.152.152

Revision as of 21:25, 12 October 2014

Organization

  • Time: 11:30 EDT
  • Connecting: detailed instructions are here
  • Conference id: 536076821
  • Present:

Agenda

  1. Announcements
  2. Accelerator-Hall D Interface Control Document, draft 14 - Elton S.
  3. Photon beam commissioning plan overview - Richard J.
  4. Shift schedule review
  5. Tagger hall simulations - Richard J.
  6. Tagger hall configuration during initial beam tune - discussion
  7. Report on tagger hodoscope setup and tests in Tagger Hall - Franz K.
  8. Report on tagger microscope setup and tests - Alex B.
  9. Report on active collimator setup and tests - Alex B.
  10. Report on pair spectrometer setup and tests - Alex S.
  11. Report on diamond milling and mount construction - Brendan P
  12. Report on polarimeter construction - Michael D