Difference between revisions of "BLTWG Meeting 10/15/2018"

From GlueXWiki
Jump to: navigation, search
(Created page with "=== Organization === * Time: 11:30 EDT * JLab meeting room: A110 * Connecting: detailed instructions are here ** H.323 ip address: 199....")
 
(Agenda)
Line 24: Line 24:
 
## evaluation of beam flux systematic error (spectrum, normalization) - ''assignee #1''
 
## evaluation of beam flux systematic error (spectrum, normalization) - ''assignee #1''
 
## evaluation of polarization systematics (relative, absolute scale) - ''assignee #2''
 
## evaluation of polarization systematics (relative, absolute scale) - ''assignee #2''
## getting the first round CBSA simulations finished (!) - ''assignee #3''
+
## finishing the first round CBSA simulations (requested 9 months ago!) - ''assignee #3''
 
# Review of upcoming activities
 
# Review of upcoming activities
 
#* removal/remounting of 5 virgin 50um diamonds  
 
#* removal/remounting of 5 virgin 50um diamonds  

Revision as of 10:41, 15 October 2018

Organization

  • Time: 11:30 EDT
  • JLab meeting room: A110
  • Connecting: detailed instructions are here
  • Conference id: 536076821
  • Present:

Agenda

  1. Announcements
  2. Agenda for collaboration meeting
  3. Beam monitoring issues
    • Photon beam simulations
    • CB spectrum and polarization studies - Glasgow
      • Production of coherent brems simulation data - Richard
    • Update on TPOL polarization results - Sebastian
      • systematics studies with 750um converter data
    • Update on hadronic asymmetries - Justin, Alexander
    • TPOL fADC algorithm development - Sebastian
  4. Discussion of priorities for next 3 months - discussion
    1. evaluation of beam flux systematic error (spectrum, normalization) - assignee #1
    2. evaluation of polarization systematics (relative, absolute scale) - assignee #2
    3. finishing the first round CBSA simulations (requested 9 months ago!) - assignee #3
  5. Review of upcoming activities
    • removal/remounting of 5 virgin 50um diamonds
    • CLS measurements (machine down, run postponed)
    • reconfiguration of the tagger for CPP - Richard
  6. Any other business