Difference between revisions of "BLTWG Meeting 10/2/2008"

From GlueXWiki
Jump to: navigation, search
(List of documents for review pre-brief package)
(List of documents for review pre-brief package)
Line 18: Line 18:
 
===List of documents for review pre-brief package===
 
===List of documents for review pre-brief package===
 
# The general consensus was that we should take chapter 4 in the TDR version 4 and re-write it and then use this as the core of the pre-brief material.
 
# The general consensus was that we should take chapter 4 in the TDR version 4 and re-write it and then use this as the core of the pre-brief material.
# A short document which summarized the recommendations from the last review and how they were resolved.
+
# The recommendations from the last review.
 
# A drawing package for the magnet needs to be provided.
 
# A drawing package for the magnet needs to be provided.
 
# An update of the preliminary spec should be given.
 
# An update of the preliminary spec should be given.

Revision as of 10:03, 2 October 2008

  • Time: 9:30 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Writeups needed for the pre-brief materials packet - see below
  2. Tim's updated tagger hall drawings
  3. Relative placement of fixed array and microscope - Richard, Franz, Tim
  4. Resolution on tagger pole shape - Jim, Yang
  5. Remaining simulation studies needed for review - Richard
  6. Progress on simulation of the collimators - Sascha



List of documents for review pre-brief package

  1. The general consensus was that we should take chapter 4 in the TDR version 4 and re-write it and then use this as the core of the pre-brief material.
  2. The recommendations from the last review.
  3. A drawing package for the magnet needs to be provided.
  4. An update of the preliminary spec should be given.
  5. Yang's note on the TOSCA and transport studies should be included.
    • Yang's report
    • Dan Sober has agreed to work on improving this document.
  6. A description of the present status of the fixed hodoscope.
  7. The June R+D note on the microscope
  8. The pair spectrometer proposal with a few updated.
  9. Plan for what we want to study with diamonds.
  10. Simulations - Alex

Table of contents for Chapter4 of the TDR V4

http://argus.phys.uregina.ca/gluex/DocDB/0011/001127/002/PPS_Review08.pdf

1 Introduction Richard 1
2 Choice of technique " 3
2.1 Compton back-scatter " 3
2.2 Tagged bremsstrahlung " 6
2.3 Coherent bremsstrahlung " 7
3 Photon source " 11
3.1 Essential features " 12
3.2 Use of collimation " 14
3.3 Choice of raditor " 23
3.4 Crystal quality " 25
3.5 Crystal thickness " 31
3.6 Crystal mount Franz 33
3.7 Crystal alignment and monitoring Franz 35
3.8 Crystal lifetime " 36
4 Electron beam Jim 39
4.1 Beam polarization " 39
4.2 Beam emittance " 41
4.3 Electron beam line optics " 44
4.4 Electron beam dump " 47
4.5 Beam containment and shielding Alex 47
5 Tagging spectrometer Jim 51
5.1 Specifcations " 51
5.2 Magnet " 52
5.3 Spectrometer optics " 54
5.4 Tagger detectors Franz 56
5.4.1 Focal plane microscope detectors Richard 56
5.4.2 Fixed focal plane array Franz 56
5.5 (move to electron beam section) Beam dump optics Jim 57
6 Pair Spectrometer Jim 59
7 Operating beam intensity (Delete) Curtis 63