Difference between revisions of "BLTWG Meeting 10/23/2017"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 20: Line 20:
 
# Planning for fast raster in Hall D - ''discussion''
 
# Planning for fast raster in Hall D - ''discussion''
 
#* [https://logbooks.jlab.org/entry/3401185 results from early test]
 
#* [https://logbooks.jlab.org/entry/3401185 results from early test]
#* size of pattern at collimator
+
#* limits on size of pattern at collimator? radiator?
 
# Planning of radiators for F2017/S2018 running - ''discussion''
 
# Planning of radiators for F2017/S2018 running - ''discussion''
 
#* JD70-100 : 58um, the one we ran with in S2017, default choice for F2017
 
#* JD70-100 : 58um, the one we ran with in S2017, default choice for F2017

Revision as of 09:11, 23 October 2017

Organization

  • Time: 11:30 EDT
  • JLab meeting room: A110
  • Connecting: detailed instructions are here
  • Conference id: 536076821
  • Present:

Agenda

  1. Announcements
  2. Planning for improved beam normalization (TAC runs) - discussion
    • improved limits for low-current operation
    • limits on radiator thickness from halo?
    • effective thickness of wire radiator
    • systematics from collimation restriction
    • systematics from collimator offsets
    • systematics from absorption (simulation)
  3. Planning for fast raster in Hall D - discussion
  4. Planning of radiators for F2017/S2018 running - discussion
    • JD70-100 : 58um, the one we ran with in S2017, default choice for F2017
    • JD70-105 : 54um, essentially same size and thickness, quality as JD70-100, unused
    • JD70-104 : 20um, proposed for evaluation and testing
  5. Any other business

Notes