Difference between revisions of "BLTWG Meeting 10/9/2008"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 5: Line 5:
  
 
===Agenda===
 
===Agenda===
 
+
# Update on writing assignments - ''Jim''
 
# Location of focal plane - see below
 
# Location of focal plane - see below
 
# Updated tagger drawings - ''Tim''
 
# Updated tagger drawings - ''Tim''
Line 11: Line 11:
 
# Ken Finkelstein's suggestions for prep for CHESS run in 3/2009 - ''Richard''
 
# Ken Finkelstein's suggestions for prep for CHESS run in 3/2009 - ''Richard''
 
# 3-year goals for diamond studies
 
# 3-year goals for diamond studies
 
+
#[http://www.jlab.org/Hall-D/software/wiki/index.php/Tagger_and_Beamline_Review#Dry_Run_Schedule_for_the_Review  Dry Run schedule]
 
+
 
----
 
----

Revision as of 18:50, 8 October 2008

  • Time: 9:30 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Update on writing assignments - Jim
  2. Location of focal plane - see below
  3. Updated tagger drawings - Tim
  4. Revision to Pair Spectrometer document - Jim, Hrachya
  5. Ken Finkelstein's suggestions for prep for CHESS run in 3/2009 - Richard
  6. 3-year goals for diamond studies
  7. Dry Run schedule