Difference between revisions of "BLTWG Meeting 10/9/2008"

From GlueXWiki
Jump to: navigation, search
Line 2: Line 2:
 
* Place: EVO and ESNET (with telephone bridge)
 
* Place: EVO and ESNET (with telephone bridge)
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present: Tim W., Jim S., Alex S., Richard J., Guangliang Y.
+
* Present: Tim W., Jim S., Alex S., Richard J., Guangliang Y., and Elke A.
  
 
===Agenda===
 
===Agenda===

Revision as of 10:05, 9 October 2008

  • Time: 9:30 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present: Tim W., Jim S., Alex S., Richard J., Guangliang Y., and Elke A.

Agenda

  1. Dry Run schedule
  2. Update on writing assignments - Jim
  3. Location of focal plane - see below
  4. Updated tagger drawings - Tim
  5. Revision to Pair Spectrometer document - Jim, Hrachya
  6. Ken Finkelstein's suggestions for prep for CHESS run in 3/2009 - Richard
  7. 3-year goals for diamond studies