Difference between revisions of "BLTWG Meeting 11/15/2010"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
(5 intermediate revisions by 3 users not shown)
Line 2: Line 2:
 
* Place: ESNET and EVO (with telephone bridge id 2555601)  
 
* Place: ESNET and EVO (with telephone bridge id 2555601)  
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present: Alex S., Yi Q., Hovanes E., Elton S., Tim W., Dan S., Brendan P., and Richard J.
+
* Present: Alex S., Yi Q., Hovanes E., Elton S., Eugene C., Tim W., Dan S., Brendan P., and Richard J.
  
 
===Agenda===
 
===Agenda===
Line 8: Line 8:
 
# Update on the tagger procurement package -- ''Tim''
 
# Update on the tagger procurement package -- ''Tim''
 
# Hall B beam test simulation results -- ''Richard''
 
# Hall B beam test simulation results -- ''Richard''
# [http://www.jlab.org/~somov/spec.txt Update on the alternative microscope readout ] -- ''Elton/Sascha''
+
#* [http://zeus.phys.uconn.edu/halld/tagger/fp-prototype/tests-10-2010/MicroscopeBeamTest_plan-2-2010.pdf link to parasitic beam test proposal]
# [http://www.jlab.org/~somov/bg.pptx Neutron BG simulation]
+
# [ Update on the alternative microscope readout ] -- ''Elton/Sascha''
 +
## [http://www.jlab.org/~somov/spec.txt Specifications]  Elton
 +
## [http://www.jlab.org/~somov/inq.txt Inquiry]  Elton
 +
# [http://www.jlab.org/~somov/bg.pptx Neutron BG simulation]  
 
# Progress on direct polarimetry in the Hall D beamline -- ''Hovanes''
 
# Progress on direct polarimetry in the Hall D beamline -- ''Hovanes''
 +
# Update on diamond mounting -- ''Richard''

Latest revision as of 12:35, 15 November 2010

  • Time: 11:00 EST
  • Place: ESNET and EVO (with telephone bridge id 2555601)
  • Connecting: instructions are here
  • Present: Alex S., Yi Q., Hovanes E., Elton S., Eugene C., Tim W., Dan S., Brendan P., and Richard J.

Agenda

  1. Update on the tagger procurement package -- Tim
  2. Hall B beam test simulation results -- Richard
  3. [ Update on the alternative microscope readout ] -- Elton/Sascha
    1. Specifications Elton
    2. Inquiry Elton
  4. Neutron BG simulation
  5. Progress on direct polarimetry in the Hall D beamline -- Hovanes
  6. Update on diamond mounting -- Richard