BLTWG Meeting 11/25/2013

From GlueXWiki
Revision as of 12:13, 9 December 2013 by Wcrahen (Talk | contribs) (Agenda)

Jump to: navigation, search

Organization

  • Time: 11:30 EST
  • Place: ESNET and Seevogh (Jlab community)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Update from Accelerator Division - Todd
  3. Discussion on Microscope assembly and installation -Bill
  1. Tagger + PS calibration plan - Richard
  2. Update on mapping the tagger and PS - Tim
  3. Update on the fixed tagger hodoscope - Franz
  4. Update on the microscope electronics - Alex B.
  5. Status of the microscope construction - Ann Marie
  6. Update on pair spectrometer detector - Ivan
PS arm-A construction
PS arm-A electronics test
  1. any other business

Notes