Difference between revisions of "BLTWG Meeting 11/26/2012"

From GlueXWiki
Jump to: navigation, search
(Created page with "===Organization=== * Time: 11:30 EST * Place: ESNET and EVO (with telephone bridge id ??? ????) * Connecting: instructions are here * Pre...")
 
(Agenda)
 
(3 intermediate revisions by the same user not shown)
Line 9: Line 9:
 
# Announcements
 
# Announcements
 
# Report from accelerator-GlueX contact person - ''Todd Satogata''
 
# Report from accelerator-GlueX contact person - ''Todd Satogata''
 +
# Preparations for the microscope construction - ''James''
 
# Progress toward the UConn construction contract - ''Richard''
 
# Progress toward the UConn construction contract - ''Richard''
# Radiator development update, [http://zeus.phys.uconn.edu/halld/diamonds/Zygo/XY_Cuts/ early results] from just finished CHESS run - ''Brendan''
+
# Radiator development update - ''Brendan''
# [http://faculty.cua.edu/sober/HallD/Scatter_in_Tosca_rays.html Update on tagger fixed array design] - ''Dan''
+
# Patch panel cables from inside cave to outside - ''Richard''
#: [http://faculty.cua.edu/sober/HallD/transition_region.html  Transition between fixed-array and microscope ]
+
# Preparations for the PS detector construction - ''Ivan''
#: [http://faculty.cua.edu/sober/HallD/Compare_trajectories.html  Previous links ]
+

Latest revision as of 13:33, 26 November 2012

Organization

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id ??? ????)
  • Connecting: instructions are here
  • Present: Alex S., Ivan T., Brendan P, James M., Alex B., Richard J., Franz K., Igor S., and Dan S.

Agenda

  1. Announcements
  2. Report from accelerator-GlueX contact person - Todd Satogata
  3. Preparations for the microscope construction - James
  4. Progress toward the UConn construction contract - Richard
  5. Radiator development update - Brendan
  6. Patch panel cables from inside cave to outside - Richard
  7. Preparations for the PS detector construction - Ivan