Difference between revisions of "BLTWG Meeting 11/26/2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
Line 13: Line 13:
 
# Radiator development update - ''Brendan''
 
# Radiator development update - ''Brendan''
 
# Patch panel cables from inside cave to outside - ''Richard''
 
# Patch panel cables from inside cave to outside - ''Richard''
# Preparations for the PS detectors - ''Ivan''
+
# Preparations for the PS detector construction - ''Ivan''

Latest revision as of 13:33, 26 November 2012

Organization

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id ??? ????)
  • Connecting: instructions are here
  • Present: Alex S., Ivan T., Brendan P, James M., Alex B., Richard J., Franz K., Igor S., and Dan S.

Agenda

  1. Announcements
  2. Report from accelerator-GlueX contact person - Todd Satogata
  3. Preparations for the microscope construction - James
  4. Progress toward the UConn construction contract - Richard
  5. Radiator development update - Brendan
  6. Patch panel cables from inside cave to outside - Richard
  7. Preparations for the PS detector construction - Ivan