Difference between revisions of "BLTWG Meeting 11/26/2018"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Organization)
 
(2 intermediate revisions by one other user not shown)
Line 7: Line 7:
 
** phone: 408-740-7256 or 888-240-2560
 
** phone: 408-740-7256 or 888-240-2560
 
* Conference id: 536076821
 
* Conference id: 536076821
* Present: <!--Dan S., Ken L., Richard J., J. McIntyre, Alexandre D., Alex A., Sasha S., Mike D., Justin S., and Stuart F.-->
+
* Present: Dan S., Ken L., Richard J., J. McIntyre, Alexandre D., Alex A., Sasha S., Mike D., Justin S., and Stuart F.
  
 
=== Agenda ===
 
=== Agenda ===
Line 13: Line 13:
 
# Beam monitoring issues
 
# Beam monitoring issues
 
#* [https://logbooks.jlab.org/entry/3631437 Decline in coherent edge quality seen during Fall run] - ''Justin''
 
#* [https://logbooks.jlab.org/entry/3631437 Decline in coherent edge quality seen during Fall run] - ''Justin''
 +
#* [https://logbooks.jlab.org/entry/3631428 Scaler analysis of the luminosity study] - ''Alexandre''
 
#* Update on TPOL polarization results from 2016-2017 - ''Sebastian''
 
#* Update on TPOL polarization results from 2016-2017 - ''Sebastian''
 
#* Verifying systematics for energy deposition cuts in TPOL simulation - ''pending further work''
 
#* Verifying systematics for energy deposition cuts in TPOL simulation - ''pending further work''

Latest revision as of 11:00, 10 December 2018

Organization

  • Time: 11:30 EDT
  • JLab meeting room: A110
  • Connecting: detailed instructions are here
  • Conference id: 536076821
  • Present: Dan S., Ken L., Richard J., J. McIntyre, Alexandre D., Alex A., Sasha S., Mike D., Justin S., and Stuart F.

Agenda

  1. Announcements
  2. Beam monitoring issues
  3. Priority issues for next 3 months
    1. evaluation of beam flux systematic error (spectrum, normalization) - Justin, Sasha
    2. TAC run, magnetic field restored - Sasha
    3. evaluation of polarization systematics (relative, absolute scale) - Sebastian, Richard
    4. finishing the first round CBSA simulations (requested 9 months ago!) - Richard
  4. Upcoming activities
    • schedule for TAGM fiber upgrade during winter shutdown
    • removal/remounting of 5 virgin 50um diamonds
    • CLS measurements (next run starting in January, experimental schedule pending)
    • reconfiguration of the tagger for CPP - Richard
  5. Any other business