Difference between revisions of "BLTWG Meeting 11/28/2011"

From GlueXWiki
Jump to: navigation, search
Line 2: Line 2:
 
* Place: ESNET and EVO (with telephone bridge id 437 7267)  
 
* Place: ESNET and EVO (with telephone bridge id 437 7267)  
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:  
+
* Present: Richard J., Igor S., Fridah M., Alex S., Ivan T., Tim W., Hovanes E., Mike D., Dan S., and Curtis M.
  
 
===Agenda===
 
===Agenda===

Revision as of 12:34, 28 November 2011

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 437 7267)
  • Connecting: instructions are here
  • Present: Richard J., Igor S., Fridah M., Alex S., Ivan T., Tim W., Hovanes E., Mike D., Dan S., and Curtis M.

Agenda

  1. Announcements
  2. Construction schedule for the Hall D photon beamline - Tim
  3. Diamond surface profiling results for E6-10 diamond - Richard
  4. Steel forgings and annealing oven
  5. Steel forgings closeup
  6. Discussion on the PS converter specifications - Alex, all