Difference between revisions of "BLTWG Meeting 11/28/2011"

From GlueXWiki
Jump to: navigation, search
Line 11: Line 11:
 
# [[media:Tagger_steel1.jpg|Steel forgings closeup]]
 
# [[media:Tagger_steel1.jpg|Steel forgings closeup]]
 
# [[Media:DIA0070200-3040.pdf|Discussion on the PS converter specifications]] - ''Alex, all''
 
# [[Media:DIA0070200-3040.pdf|Discussion on the PS converter specifications]] - ''Alex, all''
 +
 +
===Notes===
 +
The [[Photon Beam|Photon Beam Working Group wiki page]] is being reconfigured to reflect the status of construction.  R. Jones will take the specific items listed in the WBS related to the beam line, and create links on the [[Photon Beam|main photon beam wiki page]] to dedicated pages for each activity.

Revision as of 12:26, 30 November 2011

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 437 7267)
  • Connecting: instructions are here
  • Present: Richard J., Igor S., Fridah M., Alex S., Ivan T., Tim W., Hovanes E., Mike D., Dan S., and Curtis M.

Agenda

  1. Announcements
  2. Construction schedule for the Hall D photon beamline - Tim
  3. Diamond surface profiling results for E6-10 diamond - Richard
  4. Steel forgings and annealing oven
  5. Steel forgings closeup
  6. Discussion on the PS converter specifications - Alex, all

Notes

The Photon Beam Working Group wiki page is being reconfigured to reflect the status of construction. R. Jones will take the specific items listed in the WBS related to the beam line, and create links on the main photon beam wiki page to dedicated pages for each activity.