Difference between revisions of "BLTWG Meeting 11/28/2011"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
(6 intermediate revisions by 2 users not shown)
Line 2: Line 2:
 
* Place: ESNET and EVO (with telephone bridge id 437 7267)  
 
* Place: ESNET and EVO (with telephone bridge id 437 7267)  
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:  
+
* Present: Richard J., Igor S., Fridah M., Alex S., Ivan T., Tim W., Hovanes E., Mike D., Dan S., and Curtis M.
  
 
===Agenda===
 
===Agenda===
 
# Announcements
 
# Announcements
 
#[[media:Tagger-beamline_baseline_sep2011.pdf|Construction schedule for the Hall D photon beamline]] - ''Tim''
 
#[[media:Tagger-beamline_baseline_sep2011.pdf|Construction schedule for the Hall D photon beamline]] - ''Tim''
# Diamond surface profiling results for E6-10 diamond - ''Richard''
+
# [https://docs.google.com/document/d/19qPKZup7Kp8giwTYbQH8QaDz7O9evhzJfQWNULiPZVw/edit Diamond surface profiling results for E6-10 diamond] - ''Richard''
 
# [[media:Tagger_steel.jpg|Steel forgings and annealing oven]]
 
# [[media:Tagger_steel.jpg|Steel forgings and annealing oven]]
 
# [[media:Tagger_steel1.jpg|Steel forgings closeup]]
 
# [[media:Tagger_steel1.jpg|Steel forgings closeup]]
 
# [[Media:DIA0070200-3040.pdf|Discussion on the PS converter specifications]] - ''Alex, all''
 
# [[Media:DIA0070200-3040.pdf|Discussion on the PS converter specifications]] - ''Alex, all''
 +
 +
===Notes===
 +
The [[Photon Beam|Photon Beam Working Group wiki page]] is being reconfigured to reflect the status of construction.  R. Jones will take the specific items listed in the WBS related to the beam line, and create links on the [[Photon Beam|main photon beam wiki page]] to dedicated pages for each activity.
 +
 +
Our accumulated data on the GlueX diamond inventory is starting to build up.  These data include:
 +
 +
:* CHESS rocking curve images
 +
:* Interferometry surface profile images
 +
:* crystal information: type, thickness
 +
:* radiation damage history
 +
 +
This information is currently scattered through memory, log books, and various directories at UConn.  The plan is to organize this information into a searchable database, with a web page front end.

Latest revision as of 11:05, 1 December 2011

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 437 7267)
  • Connecting: instructions are here
  • Present: Richard J., Igor S., Fridah M., Alex S., Ivan T., Tim W., Hovanes E., Mike D., Dan S., and Curtis M.

Agenda

  1. Announcements
  2. Construction schedule for the Hall D photon beamline - Tim
  3. Diamond surface profiling results for E6-10 diamond - Richard
  4. Steel forgings and annealing oven
  5. Steel forgings closeup
  6. Discussion on the PS converter specifications - Alex, all

Notes

The Photon Beam Working Group wiki page is being reconfigured to reflect the status of construction. R. Jones will take the specific items listed in the WBS related to the beam line, and create links on the main photon beam wiki page to dedicated pages for each activity.

Our accumulated data on the GlueX diamond inventory is starting to build up. These data include:

  • CHESS rocking curve images
  • Interferometry surface profile images
  • crystal information: type, thickness
  • radiation damage history

This information is currently scattered through memory, log books, and various directories at UConn. The plan is to organize this information into a searchable database, with a web page front end.