Difference between revisions of "BLTWG Meeting 11/30/2009"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
(One intermediate revision by one other user not shown)
Line 2: Line 2:
 
* Place: EVO and ESNET (with telephone bridge)
 
* Place: EVO and ESNET (with telephone bridge)
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:  
+
* Present: Richard J, Jim M., Alex S., Ashot G., Pavel A., Bill, Victor, Tim W.
  
  
Line 10: Line 10:
 
# Status report on diamond development -- ''Richard''
 
# Status report on diamond development -- ''Richard''
 
#* [http://zeus.phys.uconn.edu/halld/sbir-11-2009/091120%20DOE%20arul.pdf new SBIR proposal submitted 11/20/2008]
 
#* [http://zeus.phys.uconn.edu/halld/sbir-11-2009/091120%20DOE%20arul.pdf new SBIR proposal submitted 11/20/2008]
 +
# [http://www.jlab.org/~somov/ms.pdf Microstrip detectors for PS] -- ''Alex''
 
# Other progress reports -- ''others''
 
# Other progress reports -- ''others''
  
 
==Notes==
 
==Notes==

Latest revision as of 12:08, 30 November 2009

  • Time: 11:00 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present: Richard J, Jim M., Alex S., Ashot G., Pavel A., Bill, Victor, Tim W.


Agenda

  1. Vertical focusing properties of the modified tagger -- Richard
  2. Progress on making a new magnetic field map -- Bill
  3. Status report on diamond development -- Richard
  4. Microstrip detectors for PS -- Alex
  5. Other progress reports -- others

Notes