Difference between revisions of "BLTWG Meeting 12/10/2012"

From GlueXWiki
Jump to: navigation, search
(Organization)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
* Place: ESNET and EVO (with telephone bridge id 620 9724)  
 
* Place: ESNET and EVO (with telephone bridge id 620 9724)  
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present: Alex B., Brendan P., James M., Alex S., Mike M., Ivan T., Tim W., Dan S., Curtis M., Franz K, and Yi Q.
+
* Present: Alex B., Brendan P., James M., Alex S., Mike M., Ivan T., Tim W., Dan S., Curtis M., Franz K, Yi Q., and Eugene C.
 
----
 
----
  
 
===Agenda===
 
===Agenda===
 
# Announcements
 
# Announcements
# Report from accelerator-GlueX contact person - ''Todd Satogata''
+
# Report from accelerator-GlueX contact person - ''Mike''
 
# Preparations for the PS detector construction - ''Ivan''
 
# Preparations for the PS detector construction - ''Ivan''
 
# Progress toward the UConn construction contract - ''Alex''
 
# Progress toward the UConn construction contract - ''Alex''

Latest revision as of 12:45, 10 December 2012

Organization

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 620 9724)
  • Connecting: instructions are here
  • Present: Alex B., Brendan P., James M., Alex S., Mike M., Ivan T., Tim W., Dan S., Curtis M., Franz K, Yi Q., and Eugene C.

Agenda

  1. Announcements
  2. Report from accelerator-GlueX contact person - Mike
  3. Preparations for the PS detector construction - Ivan
  4. Progress toward the UConn construction contract - Alex
  5. Progress toward the CUA construction contract - Franz
  6. Update from Arizona State - Mike
  7. Radiator development update - Brendan
  8. Preparations for the microscope construction - James
  9. Patch panel cables from inside cave to outside - Hovanes