Difference between revisions of "BLTWG Meeting 12/4/2008"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 11: Line 11:
 
# New simulation studies to be done
 
# New simulation studies to be done
 
# Goals for diamond assessment at CHESS in 3/2009
 
# Goals for diamond assessment at CHESS in 3/2009
 +
  
 
----
 
----
 +
 
===Loose ends to be tied up from the review===
 
===Loose ends to be tied up from the review===
 
===Simulation geometry consolidation===
 
===Simulation geometry consolidation===

Revision as of 10:03, 4 December 2008

  • Time: 9:30 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present:


Agenda

  1. Loose ends to be tied up from the review
  2. Consolidation of simulation geometries
  3. New simulation studies to be done
  4. Goals for diamond assessment at CHESS in 3/2009



Loose ends to be tied up from the review

Simulation geometry consolidation

New simulation studies

Preparation for CHESS run in 3/2009

Initiation of contacts with diamond cutters