Difference between revisions of "BLTWG Meeting 12/4/2008"

From GlueXWiki
Jump to: navigation, search
(Simulation geometry consolidation)
(Simulation geometry consolidation)
Line 33: Line 33:
 
*# New placement of the focal plane detectors
 
*# New placement of the focal plane detectors
 
*# Revised design of the exit flange and pipe from tagger vacuum chamber
 
*# Revised design of the exit flange and pipe from tagger vacuum chamber
 +
* Revised geometry for the photon beam line
 
*# Revised geometry of the primary and secondary collimators
 
*# Revised geometry of the primary and secondary collimators
 
*# Incorporation of new collimator cave geometry
 
*# Incorporation of new collimator cave geometry
Line 38: Line 39:
 
*# Introduction of a TOSCA field map for the pair spectrometer
 
*# Introduction of a TOSCA field map for the pair spectrometer
 
*# Incorporation of PS and associated shielding geometry
 
*# Incorporation of PS and associated shielding geometry
*# Validation of the above and release of new versions of hdds geometries for the Tagger Hall and Hall D simulations.
+
* Validation of the above and release of new versions of hdds geometries for the Tagger Hall and Hall D simulations.
  
 
===New simulation studies===
 
===New simulation studies===
 
===Preparation for CHESS run in 3/2009===
 
===Preparation for CHESS run in 3/2009===
 
===Initiation of contacts with diamond cutters===
 
===Initiation of contacts with diamond cutters===

Revision as of 10:25, 4 December 2008

  • Time: 9:30 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present:


Agenda

  1. Loose ends to be tied up from the review
  2. Consolidation of simulation geometries
  3. New simulation studies to be done
  4. Goals for diamond assessment at CHESS in 3/2009



Loose ends to be tied up from the review

  • Engineering issues
    1. Tagger coil cooling water flow scheme
    2. Tagger iron slab through-rods versus bolts
    3. Integration of pair spectrometer pole extensions with vacuum chamber
  • Simulation issues
    1. Clarify to what extent Moller scattering was present in tagger simulation
  • Electron beam integration issues
    1. If the electron beam is mis-steered onto the diamond holder frame, what safety system first detects that and shuts down the beam line? Is it fast enough to prevent damage to the experiment or photon beam instrumentation?

Simulation geometry consolidation

  • New geometry of the tagger spectrometer
    1. New location of the quadrupole
    2. Location and orientation of the dipole
    3. New geometry of the vacuum chamber
    4. New placement of the focal plane detectors
    5. Revised design of the exit flange and pipe from tagger vacuum chamber
  • Revised geometry for the photon beam line
    1. Revised geometry of the primary and secondary collimators
    2. Incorporation of new collimator cave geometry
    3. Refined placement and orientation of PS detectors front and back
    4. Introduction of a TOSCA field map for the pair spectrometer
    5. Incorporation of PS and associated shielding geometry
  • Validation of the above and release of new versions of hdds geometries for the Tagger Hall and Hall D simulations.

New simulation studies

Preparation for CHESS run in 3/2009

Initiation of contacts with diamond cutters