Difference between revisions of "BLTWG Meeting 6/12/2008"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 6: Line 6:
 
# Report on the status of the accelerator interface document - ''Jim''
 
# Report on the status of the accelerator interface document - ''Jim''
 
# Report from the CHESS User's Meeting - ''Richard''
 
# Report from the CHESS User's Meeting - ''Richard''
# Discussion of the updated pair spectrometer proposal - ''Jim''
+
# Discussion of [[Pair Spectrometer|the updated pair spectrometer proposal]] - ''Hratchya/Jim''
# Updated [[Pair Spectrometer|pair spectrometer proposal]] - ''Hratchya/Jim''
+

Revision as of 19:31, 9 June 2008

  • Time: 10:00 EST
  • Place: EVO and ESNET
  • Present:

Agenda

  1. Progress report on beam line shielding simulations - Alex
  2. Report on the status of the accelerator interface document - Jim
  3. Report from the CHESS User's Meeting - Richard
  4. Discussion of the updated pair spectrometer proposal - Hratchya/Jim