Difference between revisions of "BLTWG Meeting 6/12/2008"
From GlueXWiki
(→Agenda) |
|||
Line 8: | Line 8: | ||
# Report from the CHESS User's Meeting - ''Richard'' | # Report from the CHESS User's Meeting - ''Richard'' | ||
# Discussion of [[Pair Spectrometer|the updated pair spectrometer proposal]] - ''Hratchya/Jim'' | # Discussion of [[Pair Spectrometer|the updated pair spectrometer proposal]] - ''Hratchya/Jim'' | ||
+ | |||
+ | ==Notes (taken by R. Jones)== |
Revision as of 10:01, 12 June 2008
- Time: 10:00 EST
- Place: EVO and ESNET (with telephone bridge)
- Connecting: instructions are here
- Present:
Agenda
- Progress report on beam line shielding simulations - Alex
- Report on the status of the accelerator interface document - Jim
- Report from the CHESS User's Meeting - Richard
- Discussion of the updated pair spectrometer proposal - Hratchya/Jim