Difference between revisions of "BLTWG Meeting 6/12/2008"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 2: Line 2:
 
* Place: EVO and ESNET (with telephone bridge)
 
* Place: EVO and ESNET (with telephone bridge)
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:  
+
* Present: Jim, Alex, Elke, Dan S., Dan D., Richard
 
===Agenda===
 
===Agenda===
 
# Progress report on beam line shielding simulations - ''Alex''
 
# Progress report on beam line shielding simulations - ''Alex''

Revision as of 10:09, 12 June 2008

  • Time: 10:00 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present: Jim, Alex, Elke, Dan S., Dan D., Richard

Agenda

  1. Progress report on beam line shielding simulations - Alex
  2. Report on the status of the accelerator interface document - Jim
  3. Report from the CHESS User's Meeting - Richard
  4. Discussion of the updated pair spectrometer proposal - Hratchya/Jim

Notes (taken by R. Jones)