Difference between revisions of "BLTWG Meeting 6/12/2008"
From GlueXWiki
(→Feedback from CHESS User's Meeting) |
(→==) |
||
Line 13: | Line 13: | ||
====Feedback from CHESS User's Meeting==== | ====Feedback from CHESS User's Meeting==== | ||
− | ==== | + | ====Simulation of Beam Line Shielding Options==== |
Revision as of 10:26, 12 June 2008
- Time: 10:00 EST
- Place: EVO and ESNET (with telephone bridge)
- Connecting: instructions are here
- Present: Jim, Alex, Elke, Dan S., Dan D., Richard
Contents
Agenda
- Progress report on beam line shielding simulations - Alex
- Report on the status of the accelerator interface document - Jim
- Report from the CHESS User's Meeting - Richard
- Discussion of the updated pair spectrometer proposal - Hratchya/Jim