Difference between revisions of "BLTWG Meeting 6/12/2008"

From GlueXWiki
Jump to: navigation, search
(Feedback from CHESS User's Meeting)
(==)
Line 13: Line 13:
 
====Feedback from CHESS User's Meeting====
 
====Feedback from CHESS User's Meeting====
  
====
+
====Simulation of Beam Line Shielding Options====

Revision as of 10:26, 12 June 2008

  • Time: 10:00 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present: Jim, Alex, Elke, Dan S., Dan D., Richard

Agenda

  1. Progress report on beam line shielding simulations - Alex
  2. Report on the status of the accelerator interface document - Jim
  3. Report from the CHESS User's Meeting - Richard
  4. Discussion of the updated pair spectrometer proposal - Hratchya/Jim

Notes (taken by R. Jones)

Feedback from CHESS User's Meeting

Simulation of Beam Line Shielding Options