Difference between revisions of "BLTWG Meeting 7/10/2008"

From GlueXWiki
Jump to: navigation, search
 
(Agenda)
 
(3 intermediate revisions by 2 users not shown)
Line 2: Line 2:
 
* Place: EVO and ESNET (with telephone bridge)
 
* Place: EVO and ESNET (with telephone bridge)
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:
+
* Present: Yang, Dan, Jim, Richard, Tim, Franz
 +
 
 +
===Agenda===
 +
# [http://www.jlab.org/~whitey/Tagger.ppt 3D model of the tagging spectrometer] - ''Tim''
 +
# Progress on TOSCA field map - ''Yang''
 +
# Design of the Pair Spectrometer - ''Jim, Hrachya''
 +
# Readout electronics design work at UConn - ''Richard''
 +
# Report from Dan on Primex beamline issues - ''Dan''
 +
# Goals at UConn/Catholic U. prototyping + beam tests for 08/09 - ''Franz, Richard''

Latest revision as of 10:13, 10 July 2008

  • Time: 10:00 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present: Yang, Dan, Jim, Richard, Tim, Franz

Agenda

  1. 3D model of the tagging spectrometer - Tim
  2. Progress on TOSCA field map - Yang
  3. Design of the Pair Spectrometer - Jim, Hrachya
  4. Readout electronics design work at UConn - Richard
  5. Report from Dan on Primex beamline issues - Dan
  6. Goals at UConn/Catholic U. prototyping + beam tests for 08/09 - Franz, Richard