Difference between revisions of "BLTWG Meeting 7/10/2008"
From GlueXWiki
(→Agenda) |
|||
(3 intermediate revisions by 2 users not shown) | |||
Line 2: | Line 2: | ||
* Place: EVO and ESNET (with telephone bridge) | * Place: EVO and ESNET (with telephone bridge) | ||
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | * Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | ||
− | * Present: | + | * Present: Yang, Dan, Jim, Richard, Tim, Franz |
+ | |||
+ | ===Agenda=== | ||
+ | # [http://www.jlab.org/~whitey/Tagger.ppt 3D model of the tagging spectrometer] - ''Tim'' | ||
+ | # Progress on TOSCA field map - ''Yang'' | ||
+ | # Design of the Pair Spectrometer - ''Jim, Hrachya'' | ||
+ | # Readout electronics design work at UConn - ''Richard'' | ||
+ | # Report from Dan on Primex beamline issues - ''Dan'' | ||
+ | # Goals at UConn/Catholic U. prototyping + beam tests for 08/09 - ''Franz, Richard'' |
Latest revision as of 10:13, 10 July 2008
- Time: 10:00 EST
- Place: EVO and ESNET (with telephone bridge)
- Connecting: instructions are here
- Present: Yang, Dan, Jim, Richard, Tim, Franz
Agenda
- 3D model of the tagging spectrometer - Tim
- Progress on TOSCA field map - Yang
- Design of the Pair Spectrometer - Jim, Hrachya
- Readout electronics design work at UConn - Richard
- Report from Dan on Primex beamline issues - Dan
- Goals at UConn/Catholic U. prototyping + beam tests for 08/09 - Franz, Richard