BTA guidelines

From GlueXWiki
Revision as of 10:37, 29 March 2018 by Njarvis (Talk | contribs)

Jump to: navigation, search

Proposed beam time accounting guidelines (based on Mark D's proposal in https://halldweb.jlab.org/wiki/index.php/Run_Planning_Meeting_Notes,_Feb_1-Feb_7,_2018)

Accelerator beam time

  • ABU: acceptable beam used
  • BANU: beam acceptable but not used
  • BNA: beam not acceptable

Experiment beam time

  • ER: experiment ready
  • PCC: planned configuration change (when beam is masked while radiators are moved, etc)
  • UED: unplanned experiment down (unpleasant surprises, hardware failure, extended daq issues)


When the information is loaded from epics it contains automatic calculations of accelerator beam time from beamline monitors and 100% UED experiment down.


Proposed guidelines

The shift leader should ensure that the accelerator timesheet is consistent with ours. In particular, BANU should equal PCC+UED, the total time when no beam was requested.

During physics running, ABU + BANU should be the duration of good quality beam delivery.

During initial setup following beam restoration the beam quality is not so critical, so beam-time spent checking radiation levels and harp scans etc should be counted as ABU.

Total time should be estimated to the nearest minute?

(The shift leader should also make a log entry at the end of each shift showing the stripcharts for beam current and position following our whiteboard instructions.)