Difference between revisions of "Bar box darkening procedure"

From GlueXWiki
Jump to: navigation, search
(Work Plan and Current Progress)
(Work Plan and Current Progress)
 
(3 intermediate revisions by the same user not shown)
Line 17: Line 17:
 
## <s>Documenting of LED data profile with the full cover for the hall light on and off. </s> Completed on April 16th, 2019.
 
## <s>Documenting of LED data profile with the full cover for the hall light on and off. </s> Completed on April 16th, 2019.
 
##* Log: https://logbooks.jlab.org/entry/3679281
 
##* Log: https://logbooks.jlab.org/entry/3679281
## <s>Air filter checkup (just so that we don't forget).</s> Completed on pril 16th, 2019.
+
## <s>Air filter checkup (just so that we don't forget).</s> Completed on April 16th, 2019.
 
##* Log: https://logbooks.jlab.org/entry/3679160
 
##* Log: https://logbooks.jlab.org/entry/3679160
## <s>Disassemble the air-in pipe for the lower optical box (on the bottom).</s> April on 17th, 2019.
+
## <s>Disassemble the air-in pipe for the lower optical box (on the bottom).</s> Completed on April 17th, 2019.
## <s>Attaching and securing SiPM detector, making sure it can see inside the optical box (through the gap between the row #18 and the window frame). Darkening the opened air-in holes.</s> Completed on 18th, 2019.
+
## <s>Attaching and securing SiPM detector, making sure it can see inside the optical box (through the gap between the row #18 and the window frame). Darkening the opened air-in holes.</s> Completed on April 18th, 2019.
 
## Gas purge-line modification: replace the transparent N2 line with non-outgasing dark tubing.
 
## Gas purge-line modification: replace the transparent N2 line with non-outgasing dark tubing.
## <s>With the hall light on, start to uncover black cloth and start taping the light leak spot. Work from the far side to the near side of the optical box. </s>  Completed on 18th, 2019.
+
## <s>With the hall light on, start to uncover black cloth and start taping the light leak spot. Work from the far side to the near side of the optical box. </s>  Completed on April 18th, 2019.
##* Log:
+
##* Log: https://logbooks.jlab.org/entry/3679737
## Finishing up and dark seal the bottom air in-let hole of the optical box.
+
## Darkening progress
#* Note: in case of the supporting rib interference, tape and tedlar needs to be used to cover the entire area. Worst case scenario, we could consider to detach the bar box from the optical box, tape, then re-attach.
+
##* Attaching Tedlar to the barbox upstream. Completed on April 20th, 2019.
 +
##* Attaching the Unistrut on both end of the barbox. Completed on April 27th, 2019.
 +
##* Rounding the sharp corners of the supporting ribs, downstream of the barbox. Completed on April 1st, 2019.
 
# Darkening the second lowest bar box.
 
# Darkening the second lowest bar box.
 
##Disassemble the air-out pipe for the lower optical box (on the top).
 
##Disassemble the air-out pipe for the lower optical box (on the top).

Latest revision as of 10:07, 2 May 2019

Work scope and Constraints

Darkening the bar box in-situ. No use of RTV.

Work Guide lines

  • Skin over the honeycomb structure is incredibly thin, finger pressure alone will leave marks.
  • No shape edges near the box.
  • Caution when tape or removing the tape, as gentle and as slow as possible.
  • All tools (Tape and scissors) must be strapped or tied around the operator around the neck or waist to prevent dropping on on the box.
  • Safety net or cover around the bottom box when operating on the top box.

Work Plan and Current Progress

Schedule starts as soon as run finishes and hall re-opens (April 20 2019) (Pictures of the current setup and example light leak spots will be provided)

Only black tedlar and non residue black tape.

  1. Darkening of the lowest bar box.
    1. Documenting of LED data profile with the full cover for the hall light on and off. Completed on April 16th, 2019.
    2. Air filter checkup (just so that we don't forget). Completed on April 16th, 2019.
    3. Disassemble the air-in pipe for the lower optical box (on the bottom). Completed on April 17th, 2019.
    4. Attaching and securing SiPM detector, making sure it can see inside the optical box (through the gap between the row #18 and the window frame). Darkening the opened air-in holes. Completed on April 18th, 2019.
    5. Gas purge-line modification: replace the transparent N2 line with non-outgasing dark tubing.
    6. With the hall light on, start to uncover black cloth and start taping the light leak spot. Work from the far side to the near side of the optical box. Completed on April 18th, 2019.
    7. Darkening progress
      • Attaching Tedlar to the barbox upstream. Completed on April 20th, 2019.
      • Attaching the Unistrut on both end of the barbox. Completed on April 27th, 2019.
      • Rounding the sharp corners of the supporting ribs, downstream of the barbox. Completed on April 1st, 2019.
  2. Darkening the second lowest bar box.
    1. Disassemble the air-out pipe for the lower optical box (on the top).
    2. Attaching and securing SiPM detector, making sure it can can inside the optical box (through the gap between the row #1 and the window frame). Darkening the opened air-in holes.
    3. Repeating the process for the first bar box
  3. Darkening and verification of the top bar boxes.
    1. Since the optical box is not yet installed, the darkening process will take place before the optical box installation.
    2. Mount the SiPM securely at the opening end of the bar box.
    3. Repeat the rest of the procedure for darkening the lower boxes.