Difference between revisions of "Beam Test Hardware"

From GlueXWiki
Jump to: navigation, search
m (Beamline and Alcove)
(Beamline and Alcove)
Line 13: Line 13:
 
[[Installation Procedures]]
 
[[Installation Procedures]]
  
[[Installation]]
+
[[Installation of Module]] (images)
  
 
==Trigger and Timing==
 
==Trigger and Timing==

Revision as of 18:54, 28 August 2006

Beamline and Alcove

Hall-B Collimators and Flux

Beam Profile Monitor

Veto counter

Alcove and Platform

Beam Test Cabling

Installation Procedures

Installation of Module (images)

Trigger and Timing

Beam Test Trigger and electronics

Tagger trigger timing

Overall trigger timing

Cart and Optics

Optical Assembly

Cart Assembly

Cart Load Test

Mu Metal Shields