Difference between revisions of "Beam Test Hardware"

From GlueXWiki
Jump to: navigation, search
 
(24 intermediate revisions by 5 users not shown)
Line 1: Line 1:
 +
== Beamline and Alcove ==
 +
 +
[http://argus.phys.uregina.ca/drupal/gluex/taxonomy/term/38 Preparations and Communications]
 +
 
[[Hall-B Collimators and Flux]]
 
[[Hall-B Collimators and Flux]]
  
[[Alcove and Cart]]
+
[http://www.jlab.org/primex/subsystems/bpm/index.php Beam Profile Monitor]
  
[[Beam Test Trigger]] (and electronics)
+
[[Veto counter]]
 +
 
 +
[[Alcove and Cart|Alcove and Platform]]
 +
 
 +
[[Beam Test Cabling]]
 +
 
 +
[[Installation Procedures]]
 +
 
 +
[[Installation of Module]] (images)
 +
 
 +
[[BCAL Cell Cross Talk]]
 +
 
 +
[[Gain Matching]]
 +
 
 +
==Trigger and Timing==
 +
 
 +
[[Beam Test Trigger and electronics]]
  
 
[[Tagger trigger timing]]
 
[[Tagger trigger timing]]
  
[[RadPhi cables, trigger, etc.]]
+
[[Overall trigger timing]]
 +
 
 +
== Cart and Optics ==
 +
 
 +
[[Optical Assembly]]
 +
 
 +
[[Cart Assembly]]
  
[[Richard's note on RadPhi cables]]
+
[[Cart Load Test]]
  
[[More on RadPhi cables and BCAL cabling]]
+
[[Mu Metal Shields]]

Latest revision as of 11:16, 22 November 2007

Beamline and Alcove

Preparations and Communications

Hall-B Collimators and Flux

Beam Profile Monitor

Veto counter

Alcove and Platform

Beam Test Cabling

Installation Procedures

Installation of Module (images)

BCAL Cell Cross Talk

Gain Matching

Trigger and Timing

Beam Test Trigger and electronics

Tagger trigger timing

Overall trigger timing

Cart and Optics

Optical Assembly

Cart Assembly

Cart Load Test

Mu Metal Shields