Difference between revisions of "Beam Test Hardware"

From GlueXWiki
Jump to: navigation, search
(Trigger and Timing)
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
 
== Beamline and Alcove ==
 
== Beamline and Alcove ==
 +
 +
[http://argus.phys.uregina.ca/drupal/gluex/taxonomy/term/38 Preparations and Communications]
  
 
[[Hall-B Collimators and Flux]]
 
[[Hall-B Collimators and Flux]]
Line 16: Line 18:
  
 
[[BCAL Cell Cross Talk]]
 
[[BCAL Cell Cross Talk]]
 +
 +
[[Gain Matching]]
  
 
==Trigger and Timing==
 
==Trigger and Timing==

Latest revision as of 11:16, 22 November 2007

Beamline and Alcove

Preparations and Communications

Hall-B Collimators and Flux

Beam Profile Monitor

Veto counter

Alcove and Platform

Beam Test Cabling

Installation Procedures

Installation of Module (images)

BCAL Cell Cross Talk

Gain Matching

Trigger and Timing

Beam Test Trigger and electronics

Tagger trigger timing

Overall trigger timing

Cart and Optics

Optical Assembly

Cart Assembly

Cart Load Test

Mu Metal Shields