Difference between revisions of "Beam Test Meeting Mon. Apr. 09, 2012"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Agenda == [http://dustbunny.physics.indiana.edu/~kmoriya/2012-04-09-FCALGEANT-Kei.pdf FCAL GEANT simulations] (Kei)")
 
(Agenda)
 
Line 1: Line 1:
 
== Agenda ==
 
== Agenda ==
 
[http://dustbunny.physics.indiana.edu/~kmoriya/2012-04-09-FCALGEANT-Kei.pdf FCAL GEANT simulations] (Kei)
 
[http://dustbunny.physics.indiana.edu/~kmoriya/2012-04-09-FCALGEANT-Kei.pdf FCAL GEANT simulations] (Kei)
 +
 +
 +
== Minutes ==
 +
 +
-Hall B going to 3 pass = ~2.5 GeV until next Wednesday
 +
 +
-FCAL simulation presentation, see link above
 +
 +
-BCAL – see elog for daily changes
 +
 +
-Temp of chiller dropped 5C today to reduce temp
 +
 +
-need to understand oscillations
 +
 +
-need to understand chiller and internal temps better
 +
 +
-need to add calibrated remote counter to BCAL DAQ
 +
 +
-some channels have overflow bit, need to understand

Latest revision as of 14:38, 9 April 2012

Agenda

FCAL GEANT simulations (Kei)


Minutes

-Hall B going to 3 pass = ~2.5 GeV until next Wednesday

-FCAL simulation presentation, see link above

-BCAL – see elog for daily changes

-Temp of chiller dropped 5C today to reduce temp

-need to understand oscillations

-need to understand chiller and internal temps better

-need to add calibrated remote counter to BCAL DAQ

-some channels have overflow bit, need to understand