Difference between revisions of "Beam Test Meeting Mon. Apr. 16, 2012"
(Created page with " == Minutes == Hall - 3 pass (~2.5 GeV) until Thursday - 5 pass for remainder of time after Thursday FCAL - data taken at 5% of 2.5 GeV BCAL - found clog in quick disconnec...") |
|||
Line 1: | Line 1: | ||
− | + | == Minutes == | |
Hall | Hall | ||
- 3 pass (~2.5 GeV) until Thursday | - 3 pass (~2.5 GeV) until Thursday | ||
+ | |||
- 5 pass for remainder of time after Thursday | - 5 pass for remainder of time after Thursday | ||
+ | |||
FCAL | FCAL | ||
- data taken at 5% of 2.5 GeV | - data taken at 5% of 2.5 GeV | ||
+ | |||
BCAL | BCAL | ||
- found clog in quick disconnect (Elton, Alex, Yi, John) temps dropped by few degrees C, still +3 C on downstream side, differential between chiller and downstream decreased to 1 C | - found clog in quick disconnect (Elton, Alex, Yi, John) temps dropped by few degrees C, still +3 C on downstream side, differential between chiller and downstream decreased to 1 C | ||
+ | |||
- swapped flow direction from down to up to up to down (Elton, John) and downstream stayed +3C, confirming hypothesis of poor thermal connection on downstream side | - swapped flow direction from down to up to up to down (Elton, John) and downstream stayed +3C, confirming hypothesis of poor thermal connection on downstream side | ||
+ | |||
- Elton will give thorough report on thermal glue used at next meeting | - Elton will give thorough report on thermal glue used at next meeting | ||
+ | |||
- data taken at different bias voltages | - data taken at different bias voltages | ||
+ | |||
- still see oscillations | - still see oscillations | ||
+ | |||
Future plans | Future plans | ||
- look at scalars today(FCAL) | - look at scalars today(FCAL) | ||
+ | |||
- look at different DAQ modes tomorrow (FCAL) | - look at different DAQ modes tomorrow (FCAL) | ||
+ | |||
- will take data at different thresholds this week (BCAL) | - will take data at different thresholds this week (BCAL) | ||
+ | |||
- install CTP in a few weeks to look at trigger options | - install CTP in a few weeks to look at trigger options | ||
+ | |||
- all detectors will remain in current location until 5 pass beam is restored | - all detectors will remain in current location until 5 pass beam is restored | ||
+ | |||
- BCAL will go to 20 degree angled position on April 25, still 23 % E | - BCAL will go to 20 degree angled position on April 25, still 23 % E |
Revision as of 14:57, 16 April 2012
Minutes
Hall
- 3 pass (~2.5 GeV) until Thursday
- 5 pass for remainder of time after Thursday
FCAL
- data taken at 5% of 2.5 GeV
BCAL
- found clog in quick disconnect (Elton, Alex, Yi, John) temps dropped by few degrees C, still +3 C on downstream side, differential between chiller and downstream decreased to 1 C
- swapped flow direction from down to up to up to down (Elton, John) and downstream stayed +3C, confirming hypothesis of poor thermal connection on downstream side
- Elton will give thorough report on thermal glue used at next meeting
- data taken at different bias voltages
- still see oscillations
Future plans
- look at scalars today(FCAL)
- look at different DAQ modes tomorrow (FCAL)
- will take data at different thresholds this week (BCAL)
- install CTP in a few weeks to look at trigger options
- all detectors will remain in current location until 5 pass beam is restored
- BCAL will go to 20 degree angled position on April 25, still 23 % E