Difference between revisions of "Beam Test Meeting Mon. Apr. 23, 2012"
From GlueXWiki
(Created page with "# [https://halldweb1.jlab.org/wiki/images/0/01/Meet120423-bcal-bias.pdf BCal Bias Scan] (Andrei & Sascha)") |
|||
Line 1: | Line 1: | ||
# [https://halldweb1.jlab.org/wiki/images/0/01/Meet120423-bcal-bias.pdf BCal Bias Scan] (Andrei & Sascha) | # [https://halldweb1.jlab.org/wiki/images/0/01/Meet120423-bcal-bias.pdf BCal Bias Scan] (Andrei & Sascha) | ||
+ | |||
+ | == Minutes == | ||
+ | |||
+ | FCAL | ||
+ | |||
+ | - nothing has changed, still waiting on 5 pass photon beam | ||
+ | |||
+ | - took data at 5% of 2.5 GeV in pulst integral mode | ||
+ | |||
+ | |||
+ | BCAL | ||
+ | |||
+ | - chiller died last night and temp fell to 2 C | ||
+ | |||
+ | - condensation on lines, but none observed inside detector | ||
+ | |||
+ | - see presetation above for data analysis done | ||
+ | |||
+ | - see elog for more details about daily activities | ||
+ | |||
+ | |||
+ | Long term plan is to move BCAL to 20 degree position next week, and to move FCAL to the 23% position in two weeks |
Revision as of 10:25, 24 April 2012
- BCal Bias Scan (Andrei & Sascha)
Minutes
FCAL
- nothing has changed, still waiting on 5 pass photon beam
- took data at 5% of 2.5 GeV in pulst integral mode
BCAL
- chiller died last night and temp fell to 2 C
- condensation on lines, but none observed inside detector
- see presetation above for data analysis done
- see elog for more details about daily activities
Long term plan is to move BCAL to 20 degree position next week, and to move FCAL to the 23% position in two weeks