Beam Test Meeting Mon. Apr. 23, 2012
From GlueXWiki
Revision as of 16:07, 31 March 2015 by Marki (Talk | contribs) (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")
- BCal Bias Scan (Andrei & Sascha)
Minutes
FCAL
- nothing has changed, still waiting on 5 pass photon beam
- took data at 5% of 2.5 GeV in pulst integral mode
BCAL
- chiller died last night and temp fell to 2 C
- condensation on lines, but none observed inside detector
- see presetation above for data analysis done
- see elog for more details about daily activities
Long term plan is to move BCAL to 20 degree position next week, and to move FCAL to the 23% position in two weeks