Beam Test Meeting Mon. Apr. 23, 2012

From GlueXWiki
Revision as of 16:07, 31 March 2015 by Marki (Talk | contribs) (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  1. BCal Bias Scan (Andrei & Sascha)

Minutes

FCAL

- nothing has changed, still waiting on 5 pass photon beam

- took data at 5% of 2.5 GeV in pulst integral mode


BCAL

- chiller died last night and temp fell to 2 C

- condensation on lines, but none observed inside detector

- see presetation above for data analysis done

- see elog for more details about daily activities


Long term plan is to move BCAL to 20 degree position next week, and to move FCAL to the 23% position in two weeks